Models & Data

Seven trackers for the people who buy factory and datacenter equipment.

How long a transformer, a switchgear lineup, a chiller or a machining centre takes to arrive today. What public buyers paid for the same gear last quarter. How full the order books are at the OEMs that make it. What a 50 MW grid connection costs in fifteen US markets. Which OEMs publish their lead times and prices at all. Every number sits beside its source and its date. Headlines are free. Class detail is Pro at $40 a month, or $400 a year. History, rows and API are Institutional, by quote.

A coolant distribution unit beside a liquid-cooled rack. The vermilion manifold is the line item the cost model prices per kW.

Book-to-Bill League Table

Quarterly orders, backlog and book-to-bill for every listed electrical, power and cooling OEM, from filings only, with the read-across for buyers: which classes are getting longer and which are clearing.

3.0 xPowell Industries book-to-bill, Aug 2026

Quarterly. Headline free. Compiling data

Datacenter MEP Cost Table

Capex per MW by component on the Turner & Townsend and JLL baselines, air-cooled and liquid-cooled, with each line's lead time from the Lead-Time Monitor and the carrying cost of delay.

$9.8M per MWall-in datacenter build cost, Mar 2026

Quarterly. Pro. Compiling data

Large-Load Cost Table

What a 50 MW connection costs and takes in 15 US markets: study fees, security per MW, minimum bills, contract terms, exit fees and realistic energization year, from tariffs and dockets.

2033realistic energization year for a new 50 MW load in Northern Virginia, Aug 2026

Updated as dockets move; reviewed monthly; energization years revisited each quarter. Table free. Compiling data

Lead-Time Monitor

Published lead times for eleven equipment classes compiled from OEM lead-time guides, Census M3 unfilled orders over shipments, ISM supplier deliveries and backlog disclosures in filings. Every cell carries its OEM and date.

50 weeksLV switchgear, Sep 2026

Monthly. Headline free. Compiling data

OEM Disclosure Scorecard

Does the OEM publish lead times, list prices, backlog in dollars, capacity in units and delivery performance? Scored from observable facts, source beside every cell, right of reply before publication.

12 of 90Cells scored Yes across 18 OEMs and five disclosure criteria, Sep 2026

Semi-annual. Free. Compiling data

Public Bid-Tab Price Book

Transaction prices from public utility, municipal, state and federal procurement awards for transformers, MV switchgear, gensets and chillers, normalized to $/kVA, $/section, $/kW and $/ton bands with n, region and award date.

$69 /kVAPad-mount 3-phase 225 to 500 kVA, Aug 2026

Rolling additions; bands recomputed quarterly once the launch threshold is met. Bands free. Compiling data

Equipment Price Benchmark

Contributed quotes and invoices for machine tools, robots and electrical gear, normalized to spec. Launches as a contribution form and a promise; distributions publish only when a cell has five or more contributors and eight or more quotes.

Contribution form openno distribution is printed until a cell meets the size rules; contributions received so far: none

Quarterly. Contribute to see. Coming

How an Institutional model is delivered

The Excel workbook and a web dashboard, one year of updates on the model's own cadence, an onboarding call, and analyst calls when a number needs explaining. Request access from any model page and we reply within two business days with a sample tab and a price.