Tools

Free calculators, no gate. Every result has a shareable URL. Each tool names the model its defaults come from.

Live

Free to use. Pro saves inputs and exports.
  • Copper and Wire Price Sheet

    Latest copper price to $/ft of metal by NEC conductor size, with an escalation-clause calculator for bids.

    Inputs: Copper and aluminum $/lb (defaults from FRED, overwrite with the COMEX settlement), Conductor size (#4 AWG to 600 kcmil copper, 4/0 to 900 kcmil aluminum) and run length, Escalation clause: line price at bid, index at bid and at PO, copper share or pounds, deadband. Defaults from the Public Bid-Tab Price Book.

    Open the calculator
  • Genset TCO

    Ten-year cost of a standby or prime generator set: diesel vs gas vs dual fuel, fuel, maintenance, permitting, Tier 4 aftertreatment, run hours.

    Inputs: Rating (kW), fuel (diesel, gas, dual) and Tier 4 Final toggle, Run hours per year and average load, Fuel price (diesel default from EIA via FRED; gas from your contract) and fuel use from the spec sheet. Defaults from the Public Bid-Tab Price Book.

    Open the calculator
  • Large-Load Interconnection Cost

    MW and market to study fees, security deposit, minimum-bill exposure and realistic energization year, from the Large-Load Cost Table.

    Inputs: Market (15 utilities across PJM, ERCOT, CAISO, MISO and the non-RTO Southeast and West), Requested MW, Your demand charge ($/kW-month) to dollarize the minimum bill. Defaults from the Large-Load Cost Table.

    Open the calculator
  • Lead-Time-Adjusted Schedule

    PO dates and equipment classes in; critical path, temporary-power cost and energization month out, using the Monitor's current published lead times.

    Inputs: Equipment lines: class, PO date, install weeks after delivery (add or remove lines), Target energization date, Temporary power kW and your rental rate ($/kW-month). Defaults from the Lead-Time Monitor.

    Open the calculator
  • PJM Capacity Charge Estimator

    Peak load contribution and zone to the annual capacity charge at the 2025/26 to 2028/29 clearing prices, and what ELRP claws back.

    Inputs: PJM zone (Met-Ed, AEP, PPL, PECO, Duquesne) and peak load contribution at the meter (kW), Delivery year, 2025/26 to 2028/29, EDC loss multiplier, with published values for Met-Ed and AEP Ohio. Defaults from the Large-Load Cost Table.

    Open the calculator
  • Quote Check

    Spec in (class, kVA or kW or sections, voltage, region), price band and published lead time out, from the Bid-Tab Price Book and the Lead-Time Monitor, with n and date.

    Inputs: Equipment class: pad-mount transformer, substation transformer, MV switchgear, diesel genset, chiller, Size (kVA, sections, kW or tons), voltage and region, Your quote (optional). Defaults from the Public Bid-Tab Price Book.

    Open the calculator
  • Tariff Exposure Calculator

    HTS code plus country of origin to landed cost under Sections 232 and 301 and the current reciprocal schedule, with the Federal Register or CSMS citation and a checked-on date.

    Inputs: HTS heading (22 machinery and electrical lines) and country of origin (9), Declared customs value and entry date (before or after the Annex III sunset on Dec 31 2027), Optional: Section 232 dutiable share, USMCA or KORUS qualification, US-melted metal, freight and brokerage. Defaults from the Public Bid-Tab Price Book.

    Open the calculator
  • Transformer Sizing and Cost

    Load, voltage class and impedance to MVA, price band from the Bid-Tab Price Book and published lead time from the Monitor.

    Inputs: Connected load, power factor, demand factor, Growth allowance and loading target, Redundancy (N, N+1, 2N). Defaults from the Public Bid-Tab Price Book.

    Open the calculator