Copper and Wire Price Sheet
Latest copper price to $/ft of metal by NEC conductor size, with an escalation-clause calculator for bids.
Method
Metal value per foot = conductor metal weight (lb per 1,000 ft, from NEC Chapter 9 Table 8 areas at 3.027 lb/kft per kcmil for copper and 0.919 for aluminum, times 1.02 for stranding) times the metal price. Default prices are the IMF global copper and aluminum prices via FRED (PCOPPUSDM, PALUMUSDM, latest monthly average); US bids clear off COMEX, which carried a premium over LME through 2026, so enter the settlement of the day. The result is bare metal, not a wire price: insulation, distributor margin and freight sit on top. The escalation calculator applies the clause published in the copper tariff piece: full difference between the index at bid and at PO, times the scheduled copper content, outside a symmetric deadband.
Every input is mirrored to the URL so a scenario can be shared as a link.
Default assumptions come from the Public Bid-Tab Price Book. Pro subscribers can save inputs. Institutional seats get the underlying series.
Articles that use this calculator

Tariffs, September 2026: The Actual Schedule for Machinery and Electrical Gear
A 2,500 kVA pad-mount transformer entered at Long Beach on September 9, 2026 pays 25% duty whether it was built in Monterrey, Osaka or Mumbai, and 50% if it was built in Jiangsu. A low-voltage panel with the PLC already in it pays 0% from Mexico, 10% from…

SendCutSend: How a Bootstrapped Reno Shop Became a $1 Billion Parts Factory
SendCutSend has shipped more than 30 million laser-cut parts to more than 300,000 customers from three plants in Reno, Nevada, Paris, Kentucky and Arlington, Texas, and until May 2026 it did so on a $750,000 laser financed by its founder, bank loans and…

Modular Is Not Cheaper: A 50 MW Prefab Electrical Room, Line by Line
Austin Energy paid Crown Texas $725,183 for one prefabricated 16 by 60 foot control house in June 2023. The house was $489,270 of that. The truck was $12,500, the stairs shipped separately for $5,000, and the crew that unloaded and anchored it billed…

800 VDC Will Strand Your White-Space Frame Agreement
NVIDIA put a ship date on 800 VDC on August 11, 2026: the MGX power rack arrives in the second half of 2026. A 2 MW-per-row power center with an 800 VDC busway follows in 2027, and a DC power block that converts grid power in one step is the design for new…

How to Write an RFQ for Capital Equipment in 2026
The City of Ocala, Florida agreed to pay $8,070,340 for two 105 MVA autotransformers in August 2023 and approved $9,170,340 for the same two units on April 28, 2026, seven months before the first one arrives. The $1.1 million difference is one clause: a PPI…

Grainger's 2017 Confession: The Year a Distributor Admitted Its List Prices Were Fiction
On April 18, 2017, W.W. Grainger told investors that the first quarter "clearly fell short of our expectations, driven primarily by the stronger than anticipated customer response to our U.S. strategic pricing actions." It had cut list prices across the…

Reading a Switchgear Quote: The Eleven Line Items That Hide the Schedule
Riverside Public Utilities paid $2,561,551.88 for one 15 kV metal-clad switchgear lineup in June 2024, and the unit was still in the factory eighteen months later. The board memo that approved the purchase put delivery in the first quarter of 2026; the next…

Grainger vs McMaster vs Amazon Business: A 50-SKU Price Basket
We priced the same 50 maintenance items at six distributors on one day, 10 September 2026, and the dearest storefront that would show us a price charged a median 126% more than the cheapest for the same part. A 3M 2097 P100 filter pair was $8.80 at…

Nox Metals: The Detroit Startup Cutting Aluminum Plate in 36 Hours
Nox Metals quotes a saw-cut aluminum block in seconds and, by its lead investor's count, delivers it in an average of 36 hours, in a trade where the quote alone has taken three to five days. The company is fourteen months old. It launched out of Y…

The 2 MW Plant Service Upgrade Nobody Budgets Right
A 400-person plant adding 2 MW of service pays for five things the switchgear quote never mentions, and together they run $400k to $1.2M with one month of bridge power. The calendar is worse than the money: run the project the way most plants run it, utility…

What 2,439 Public Change Orders Show About Electrical and Mechanical Contractors
The median electrical or mechanical contract in our set of 1,096 federal awards closed 1.8% above its award price. The dollars closed 9.5% above it. That gap between the typical contract and the typical dollar is the whole story of change orders: most jobs…

Copper at $6.77: How a 50% Tariff Shows Up in a 200-Amp Panel
COMEX copper settled at a record $6.77 per pound on August 7, 2026, the day after the Democratic Republic of Congo banned concentrate exports. The 50% Section 232 copper tariff has been in force since August 1, 2025, and it does not apply to the cathode that…

Datacenter Construction Is Eating Your Electricians
Loudoun County's electrical contractors had 5,615 people on payroll in 2019. In the fourth quarter of 2025 they had 13,352, and by March 2026 14,022, a 138% increase in six years. That is what a few gigawatts of datacenter construction does to one trade in…

Why Your Switchgear Costs 50% More Than in 2021
The BLS producer price index for switchgear and switchboard manufacturing stood at 394.8 in July 2026, 78% above January 2021. Wood Mackenzie's survey puts medium-voltage switchgear at +50% since 2021 and circuit breakers at +47%, as reported by POWER…

Quote Check: What Your Switchgear Quote Should Have Said
Riverside Public Utilities paid $2,254,387.50 for one 15 kV metal-clad switchgear lineup in May 2025. The median public award for a 5 to 15 kV metal-clad lineup in the Open Factory Public Bid-Tab Price Book is $1,481,321 across 12 awards from five utilities…

Tariff Bill of Materials: What Sections 232 and 301 Add to a UPS, a Lineup, a Genset and a Megapack
A 1 MW UPS assembled in the United States from the parts a US OEM actually buys carries about 17 points of federal duty in its ex-works price. The same UPS imported finished from China carries 55. The "50% copper tariff" that every quote now cites is 3.8 of…

The Copper and Wire Price Sheet, Weekly
A foot of 500 kcmil copper holds $9.48 of metal at the $6.14 a pound the IMF recorded for July 2026. The distributor who sells it priced it off a COMEX open of $6.28 that month, so the same foot was $9.70 before insulation, margin or freight. The Copper and…

The $2,850 Report That Says Nothing
IBISWorld's ProcurementIQ profile for "Switchgear Systems in the US" prices the whole category at one benchmark, $37,300 per system. The 118 public switchgear awards in the Public Bid-Tab Price Book run from $12,492 for a two-way S&C pad-mount switch…

The 171-Day Capex Lead Time: ISM's Most Ignored Table
The average manufacturing buyer now commits to capital equipment 171 days ahead of need, and 27% of them commit more than a year out. Those two numbers sit in the Buying Policy table on the last page of the ISM Manufacturing Report On Business, below the…